New look for an old flower bed
Move 4800 pounds of soil, 1000 pounds of compost, 600 pounds of paver sand, 25 linear feet of concrete blocks, and 45 linear feet (times 3) of bricks over a period of three days. Oh, and don’t forget the part about yanking out 25 linear feet of 5 foot high box holly and a whole bunch of monkey grass. What do you get?